PRC BUILDERSGeneral Contractor · Milford, CT

← Commercial Construction

Tenant Improvements · Fairfield & New Haven Counties

Tenant Improvement Contractor in Connecticut

Tenant improvements turn a delivered space into a working one. We build TI projects for landlords and tenants across Southern Connecticut, priced against the work letter, scheduled to the rent commencement date, and papered the way leases and lenders expect.

CT Licensed — NHC.0016349 · HIC.0661478$2M Insured · COIs on RequestW-2 Crews

Who This Is For

You’re in the right place.

For landlords and property managers delivering spaces to new tenants, tenants building out a leased space, and brokers who need a contractor to price a space before the lease is signed.

What’s Included

  • Demising walls, partitions and doors
  • Ceilings, lighting and finishes
  • Restrooms and accessibility upgrades
  • HVAC, electrical and plumbing distribution coordinated with licensed trades
  • Data and low-voltage rough-in coordinated with the tenant’s vendor
  • Storefronts and entries
  • Strip-out of the previous tenant’s work through PRC Demolition
  • Permits, inspections and the certificate of occupancy

How a TI Project Runs

From work letter to certificate of occupancy.

1. The work letter

The lease and its work letter split landlord’s work from tenant’s work and set the tenant improvement allowance. We read it first, because it decides who pays for what.

2. Pricing & design

We price a test fit or the architect’s drawings early, so the design, the allowance and the schedule line up before anyone commits.

3. Permits

A building permit, plus fire marshal review for commercial work. In Milford and West Haven, the fire marshal reviews everything except one- and two-family homes. A change of use adds zoning.

4. Build & close out

Inspections, the certificate of occupancy, lien waivers and a closeout package your landlord, tenant and lender can file.

Landlord’s Work vs. Tenant’s Work

We work for either side of the lease.

Landlords use us to deliver spaces in the condition the lease promises, whether that’s a vanilla shell, a white box or a turnkey suite, and to turn spaces between tenants without loose ends. Tenants use us to build out against the allowance, with a schedule tied to the rent commencement date and no surprises in the landlord’s approval process.

Either way, the scope, schedule and insurance are in writing before work starts, and certificates of insurance name the landlord, the property manager and the tenant as the lease requires.

Strip-Out First

Demolition and build-out under one contract.

In Connecticut, demolition needs its own state license, and a home improvement or major contractor license does not cover it. Our demolition division, PRC Demolition, holds Class B license DMCR.003450, so the previous tenant’s space comes out and your build-out goes in under one company, one schedule and one point of contact.

Where We Build

TI work across Southern Connecticut.

Tenant improvement work follows the office and retail corridors: Shelton’s Bridgeport Avenue and Route 8 office parks, Trumbull’s corporate park at Route 8 and the Merritt Parkway, the Boston Post Road retail strips in Milford, Orange, Fairfield and Westport, and downtown New Haven.

Tenant Improvements: Questions, Answered

What is a tenant improvement allowance?

It is the amount a landlord contributes toward a tenant’s build-out, set in the lease. The work letter defines what it can be spent on. We price the scope against it early so you know where the allowance ends and the tenant’s own money starts.

Who hires the contractor, the landlord or the tenant?

Either, depending on the lease. Some landlords build the improvements and deliver a finished space; others hand the tenant an allowance and let the tenant hire. We work for both.

Can you price a space before we sign the lease?

Yes. Send the floor plan, a test fit or the broker’s package and we will walk the space and price the build-out, so the allowance negotiation is based on real numbers.

What permits does a tenant improvement need?

A building permit, with fire marshal review for commercial work. A change of use adds zoning review, and food service adds local health department plan review. We handle the applications and inspections through the certificate of occupancy.

Can you handle demolition of the previous tenant’s space?

Yes. PRC Demolition, our licensed demolition division, strips the space under the same contract, so there is no gap between demolition and the build-out.

Still have questions? We’re here to help.

Ready When You Are

Have plans? Send them over.

Drawings, a lease exhibit, or a walkthrough — we’ll price the scope, commit to a schedule, and put it all in writing.