Excavation · Fairfield & New Haven Counties
Excavation Contractor in Connecticut
Excavation sets the lines and levels everything else is built from. We excavate for commercial buildings, new homes, additions and utility runs across Southern Connecticut, to the grades on the plans and with the site left ready for the next trade.
Who This Is For
You’re in the right place.
For developers and commercial owners preparing a site, general contractors and builders who need an excavation subcontractor, and property owners with a project that starts below grade.
What’s Included
- Bulk excavation and cuts and fills
- Building pads for commercial and residential construction
- Footing and foundation excavation
- Trenches dug for water, sewer, electrical and drain lines, with the pipe installed by the licensed trade
- Removal of old foundations, slabs and buried debris
- Hauling and disposal of excess material
- Backfill, compaction and rough grading
- Call Before You Dig coordination and erosion controls
How an Excavation Job Runs
From the survey stakes to a site ready to build.
1. Plans and layout
We work from the site plan and foundation drawings. The surveyor stakes the building and the limits of work, and we confirm depths and elevations before the first cut.
2. Locates and controls
The Call Before You Dig ticket is filed, the utilities mark their lines, and silt fence and the construction entrance go in before the ground is opened.
3. The dig
We excavate to the planned elevations, stockpile material that can be reused as fill, and haul off what can’t. Trenches five feet or deeper are sloped, benched or shored as OSHA requires.
4. Backfill and hand-off
Once the foundation or utilities are in and inspected, we backfill in compacted lifts, rough grade, and leave the site ready for the next trade.
What’s in the Ground
Connecticut soil, ledge and groundwater.
Southern Connecticut ground changes from lot to lot. Shoreline sites often have a high water table and soft soils. Inland lots run into ledge and boulders. Older commercial and industrial sites can hide buried foundations, tanks and fill of unknown origin.
We ask for the soil borings or test pits when they exist, and price what the dig is likely to meet. If the ground holds something no one expected, you hear about it the day we find it, with the options in writing.
Before Anyone Digs
The approvals and locates that come first.
Call Before You Dig
Connecticut law requires a Call Before You Dig ticket at least two full working days before excavation starts, so the utilities can mark their lines. We file it and dig to the marks.
Wetlands
Every Connecticut town has an inland wetlands agency. Work in a wetland, a watercourse or the regulated area around one needs its permit before the ground is disturbed.
Erosion control
Projects that disturb more than half an acre need an erosion and sediment control plan, and sites of an acre or more fall under DEEP’s construction stormwater permit. Silt fence and a stabilized entrance go in first.
Coastal and flood zones
Shoreline towns add coastal site plan review, and lots in a flood zone bring elevation and fill limits. We read the survey and the approvals before pricing the dig.
Related Work
The scopes that sit on either side of the dig.
Excavation rarely stands alone. If there is a building to take down first, PRC Demolition handles it under a Connecticut demolition license. If there is a foundation to dig and backfill, or a site to grade afterward, the same crew stays on.
Excavation: Questions, Answered
Do you do commercial excavation?
Yes. We excavate building pads, foundations and utility trenches for commercial projects in Fairfield and New Haven counties, for owners directly or as a subcontractor to the general contractor.
Do I need a permit to excavate in Connecticut?
Excavation for a building is covered by that project’s zoning and building permits. Digging near wetlands or a watercourse needs the town inland wetlands agency’s approval, and larger sites need an erosion and sediment control plan. Every excavation needs a Call Before You Dig ticket at least two full working days ahead.
What happens if you hit ledge or groundwater?
We stop, show you what we found and give you the options in writing before going further. Asking for borings or test pits before the job is priced is the best way to avoid the surprise.
What do you do with the excavated material?
Suitable material is stockpiled on site and reused as backfill and fill. The rest is hauled off and disposed of, which is included in the written scope.
Can you work as a subcontractor for our general contractor?
Yes. We provide certificates of insurance, work to your schedule and coordinate with your foundation and utility trades.
Still have questions? We’re here to help.
More site work
Site Work · Foundation Excavation & Backfill · Grading · Commercial Construction · Ground-Up Commercial · New Construction
Ready When You Are
Have plans? Send them over.
A site plan, foundation drawings, or a walk of the lot — we’ll price the scope, commit to a schedule, and put it all in writing.